Prime Machineries to Execute Road/ Bridge works under PWD
Type of required prime machineries, as per technical requirements shall be reflected in the items of works itself of the estimate.
Public Works Department provides infrastructural support for both original and repair works to all the departments directly under the Govt. of West Bengal.
Type of required prime machineries, as per technical requirements shall be reflected in the items of works itself of the estimate.
Governor is pleased in the interest of Public Service to sanction creation of the following posts as mentioned at Col. No. 2 below in the Pay Band Scale with Grade Pay as indicated against each post at Col. No. 4 for the Offices/ Establishments as mentioned at Col. No. 5.
Exemption of Licence fees and Performance Guarantee for laying of water pipe line along and across the roads belonging to PWD for the departments of Government of West Bengal and Urban Local Body of the Government of West Bengal.
Due to unprecedent heat wave passing through the entire State the patient parties along with the relatives of the admitted patients and OPD patients are suffering from agonizing heat effects.
All DDOs under PWD should note that the fund, specifically allotted under the non salaried heads, shall be withdrawn unconditionally, unless utilized within two (02) months from the date of the allotment of fund.
Allotment of official works of the Secretary, PWD and the Joint Secretary (Personnel), PWD in the following manner:
Guideline for preparation of Detail Estimate for Internal Electrical Installation Work/ LAN, Wi-fi, Voice Networking, CCTV etc.
Road Condition Monitoring System (RCMS) has been developed and integrated in existing SAMIKSHA portal where defects of road, e.g. potholes, alligator cracks, longitudinal cracks, subsidence/ depression are captured.
The desirous staff and officers of Finance Department have been allowed to stay at their respective offices situated at Nabanna, Writers’ Buildings, Todi Mansion and Bikash Bhaban at the night of 1st September, 2015.
To avoid such damages and for the smooth vehicular movement it is hereby directed that no Speed Breakers/ Humps over the roads would be constructed, without getting Departmental concurrence.