Public Works, DPR , National Building Code đī¸ 649
Salient points in Electrical aspects for preparation of DPR for different projects as per National Building Code – A General Guideline for consideration of important Electrical Aspects at the design stage for utility service for an important building.
Government of West Bengal
Public Works Department
Technical Branch
Memo No. 49(3)-Works-TE Date: 18.11.2014
To
1. Chief Engineer (HQ), PWD., Nabanna, Howrah
2. Chief Engineer, P. W. (R) D., Nabanna, Howrah
3. Chief Engineer, Social Sector, PWD., N. S. Building, Kol.
Sub: A General Guideline for consideration of important Electrical aspects at the DPR/design stage.
It has been observed that during preparation of DPR/Design of multi-storied buildings, bridges, some important electrical aspects, without which the time-bound project gets delayed/hampered during execution, are inadvertently ignored. To sort out the problem and for smooth execution of the project some salient points were elaborately discussed and circulated in the meeting at Government Guest House, Hungerford Street, Kolkata on 14th & 15th November, 2014 wherein the E-in-C & E.O. Secy., PWD and other Engineer Officers were present.
I am once again, in the interest of public works, enclosing the guide lines and salient points for electrical works for its proper implementation before finalizing the DPR/Design parameters for the execution of the projects smoothly.
Enclosure: Two Sheets
Sd/- Chief Engineer (El.)-I, PWD
SALIENT POINTS IN ELECTRICAL ASPECTS FOR PREPARATION OF DPR FOR DIFFERENT PROJECTS AS PER NATIONAL BUILDING CODE
Planning of Electrical Installations (National Building Code -2005 – Part – 8 – Section – 2
4.1.3. page-10 of NBC | Proper coordination amongst Architects, Civil and Electrical Engineers shall be effected from the planning stage of the installation. The provisions that will be needed for the accommodation of Sub-Station, Transformer, Switch Rooms, Service Rooms, Cable Ducts, Rising Mains, Distribution Cables, Sub-Distribution Boards, Opening and Chases in floors/walls for all required electrical installation etc. shall be specified in advance. |
4.2.1. page-10 of NBC | Location and requirement of Sub-Station: The Sub-Station should preferably be located in a separate building and should be adjacent to the Generator Room. Location of Sub-Station in basement floor should be avoided as far as possible. |
Ideal location for Electrical Sub-station for a group of buildings would be at load centre on ground floor. | |
Air-conditioning Plant Room to be considered, if required. | |
At least 6 Meter clear distance between the adjacent buildings and Sub-Station so that Fire Tender is able to pass between the two structures. | |
4.2.2. page -11 of NBC | Types of Buildings for Sub-Stations: The Sub-Station enclosure i.e. walls, floors, ceiling, opening doors etc. shall have two hours fire rating (c) Part 4 of Fire and Light Safety. |
4.2.4. (m) – 2 page -13 of NBC | Special care should be taken to ventilate the transformer rooms and where necessary louvers at lower level and exhaust fan at higher level may be provided. |
4.2.4. (m) – 4 page -14 of NBC | The minimum height of High Voltage Switch Gear Room shall be 3.6 Meter below the Soffit of the room. |
3.5. page – 9 of NBC | Execution of Works: The works of Electrical Installations shall be carried out by a Licensed Electrical Contractor and under the direct supervision of a person holding a Certificate of Competency. |
A General Guideline for consideration of important Electrical Aspects at the design stage for utility service for an important building.