DPR
DPR stands for Detailed Project Report, a comprehensive document that outlines the specifics of a project, including its objectives, scope, feasibility, cost estimates, timelines, and implementation strategies. It serves as a blueprint for planning and execution.
Guidelines/ SoP for taking up IT works of Govt Department by PWD
The format contains component wise requirement of IT equipment and services which are to be finalized during project preparation stage in order to prepare a realistic DPR for timely completion and to avoid changes during execution.Guidelines/ SoP for taking up works of Govt Departments by PWD
The administrative Department needs to provide requisition with all necessary inputs i.e. land details and availability, type and nature of services to be provided (both civil and electrical) etc.Preparation of DPR (Electrical) as per National Building Code
Salient points in Electrical aspects for preparation of DPR for different projects as per National Building Code – A General Guideline for consideration of important Electrical Aspects at the design stage for utility service for an important building.Engagement of Organisations for Preparing DPR
Engagement of State and Central PSU’s/ Organisations for detailed technical survey as well as preparation of Detailed Project Reports including design, plan and detailed cost estimates, etc., for, inter alia, RIDF projects.Appointment of Consultant for preparation of Detailed Project Report
Governor is pleased to empanel the following three Government Technical Institutes of National repute for preparation of DPR. (i) IIT, Kharagpur (ii) Jadavpur University (iii) Bengal Engineering and Science University, Shibpur.FinanceHealthTransportHigher EducationHigher Secondary EducationMadrasah EducationPublic WorksSchool EducationBackward Classes WelfareLabourLand ReformsPAROthers